An alternating-current (AC) charging group needs an agreed recovery sequence after its electricity supply returns. The operator should know whether existing sessions resume, which drivers must authorise again and when the normal site power limit takes effect. A charger coming back online is useful evidence, but it does not answer all three questions.
Keep this recovery plan separate from an internet-outage plan. Loss of communications and loss of electrical supply are different events. A charging unit may remain powered during a network interruption; after a power cut, the equipment, its controller and its communications connection may all need to become available again.
Describe the interruption before choosing the response
Identify which part of the installation has lost power. One charging circuit, an entire group and the whole building can leave different equipment running. The site controller or network equipment may have a different supply from the chargepoints.
A simple diagram should show the chargers, any local power controller, relevant measurement and the management connection. Use it to identify dependencies, not to invent a recovery order. The equipment supplier and electrical team need to state what the installed arrangement supports.
Record whether a session was actively charging, waiting for a scheduled start or merely connected before the interruption. Those starting conditions can affect what the operator expects afterwards. A recovery instruction that says only “restart charging” leaves too much unresolved.
Agree what happens to authorisation and records
For each starting condition, ask whether the driver needs to present a card or use an app again. Confirm how the previous session is closed or continued in the management records. The correct answer depends on the equipment and platform configuration; it should not be inferred from a protocol name.
The Open Charge Point Protocol (OCPP) connects charging stations with management systems. It does not, by itself, establish the operational recovery policy of an installed site. Ask the parties to describe the expected behaviour in ordinary language before reviewing their technical evidence.
Drivers also need a short instruction. It might tell them how to recognise a resumed session or when to contact support. It should never ask them to cycle protective devices or attempt electrical repairs.
Make the power limit part of recovery
Consider an illustrative office with twelve connected vehicles when power fails. When the supply returns, the building’s other loads also return. The recovery assessment therefore needs to include the charging group’s allowed demand, not just whether each individual vehicle can restart.
Have the project team explain when the site measurement becomes valid and which limit applies while a controller reconnects. If staged restart or a temporary conservative setting is proposed, obtain the actual supported sequence and the person authorised to manage it. Do not assume every charger provides either function.
In particular, sharing power between two outputs is not evidence that the whole building’s demand is controlled. The recovery plan must refer to the actual boundary protected by the installation’s control arrangement.
Identify the equipment rather than applying one family rule
Wall-mounted equipment and floor-mounted units with payment facilities both appear in EVB’s AC product collection. List each installed model and software version beside its recovery instruction so operators can see which chargers follow which sequence.
For a mixed installation, group equipment only where the supplier confirms equivalent behaviour. An apparently tidy site-wide instruction can be misleading if one group resumes an authorised session and another waits for the driver.
Rehearse a controlled return to service
Arrange a recovery demonstration with the responsible project team using an approved method. Record the interruption being represented, the initial session states, controller availability, authorisation result and charging demand after recovery. Keep electrical work with qualified personnel.
The test should also identify what support sees. A driver may be waiting at the vehicle while an operator sees only the equipment’s connection status. Both need an agreed point at which recovery is considered complete.
End with a short sequence owned by the operator: what happens automatically, what requires an authorised decision and how drivers obtain help. That makes the next interruption manageable without treating a successful network reconnection as proof that the charging service has recovered.